Build-up Paper in Detail and Why

Build-up paper details

This section provides a comprehensive summary of the essential details and measurements required for the vessel drydocking operation, as cited in DDG93-801-7061063 and Design Memorandum SER 250.22/MO24 dated January 21, 2005.

General Information

  • Name of Ship/Vessel: [To be specified]
  • Dry Dock Number: [To be specified]
  • Docking Position Number: [To be specified]
  • Docking Date: [To be specified]

Principal Dimensions & Block Arrangement

This section includes the main measurements and block layout necessary for the drydocking process. The following data points are essential for accurate positioning and support of the vessel in dry dock:

Distance Off Center Line
Base Height
After End at Stern Reference Point (SRP)
After End at Tile Mark Number
Rudder Details (Port & Starboard)
Distance from SRP
Distance Off Center Line
Distance Below Base

Rudder Details (Port & Starboard)

Distance from SRP
Distance Off Center Line
Distance Below Base

Keel Block & Reference Measurements

Distance from SRP to Aft Side of Keel Block
Distance from SRP to Forward Side of Keel Block #54

Propeller Details (Port & Starboard)

Distance from SRP
Distance Off Center Line (Port & Starboard) Below Base

Skeg Drain

Diameter
Distance from SRP

Masker Emitter

Frame number
Distances from SRP

Bow Mounted Sonar Dome

Distances from SRP
Approximate Distance from Center Line to Port and Starboard
Distance Below Base
Blocking Clearance

Additional Notes

Cribbing and installation of steel bearing plates on keel blocks #2 through #8 and #51 through #54 are required. Each plate should measure 42″ x 32″.

References

Docking Print Number: DDG93-801-7061063

Design Memorandum: SER 250.22/MO24, dated January 21, 2005