Build-up Paper in Detail and Why
Build-up paper details
This section provides a comprehensive summary of the essential details and measurements required for the vessel drydocking operation, as cited in DDG93-801-7061063 and Design Memorandum SER 250.22/MO24 dated January 21, 2005.
General Information
- Name of Ship/Vessel: [To be specified]
- Dry Dock Number: [To be specified]
- Docking Position Number: [To be specified]
- Docking Date: [To be specified]
Principal Dimensions & Block Arrangement
This section includes the main measurements and block layout necessary for the drydocking process. The following data points are essential for accurate positioning and support of the vessel in dry dock:
Distance Off Center Line
Base Height
After End at Stern Reference Point (SRP)
After End at Tile Mark Number
Rudder Details (Port & Starboard)
Distance from SRP
Distance Off Center Line
Distance Below Base
Rudder Details (Port & Starboard)
Distance from SRP
Distance Off Center Line
Distance Below Base
Keel Block & Reference Measurements
Distance from SRP to Aft Side of Keel Block
Distance from SRP to Forward Side of Keel Block #54
Propeller Details (Port & Starboard)
Distance from SRP
Distance Off Center Line (Port & Starboard) Below Base
Skeg Drain
Diameter
Distance from SRP
Masker Emitter
Frame number
Distances from SRP
Bow Mounted Sonar Dome
Distances from SRP
Approximate Distance from Center Line to Port and Starboard
Distance Below Base
Blocking Clearance
Additional Notes
Cribbing and installation of steel bearing plates on keel blocks #2 through #8 and #51 through #54 are required. Each plate should measure 42″ x 32″.
References
Docking Print Number: DDG93-801-7061063
Design Memorandum: SER 250.22/MO24, dated January 21, 2005